Our process

From first call to a running system.

Design, approvals, supply, installation, testing, commissioning and long-term O&M, handled by one engineering team. Here is what happens at each stage, and what you can expect from us.

Stage 01 · Enquiry & consultation

It starts with a conversation

Tell us what you want to power, where, and roughly when. A short call or an online meeting is enough for our engineers to understand your requirements and suggest a sensible next step.

No documents needed at this point. Just tell us about the site.

Discuss your project
Stage 02 · Site assessment

Start with a free site visit

The easiest first step is a visit from our engineers. We look at the roof or land, the electrical room and access, talk through what you want to achieve, and tell you exactly what we’d need for your project. The initial visit is free, subject to location and project eligibility.

Book a free site visit
How the visit works
1You get in touchCall, WhatsApp or send the form.
2We visit the siteRoof, electrical room and access.
3We tell you what’s neededNext steps and any documents, explained.
Already have documents? These help, but none are required to start
DOC 01Total Connected LoadThe TCL of the building or facility.
DOC 02Location pinThe property’s Google Maps location.
DOC 0312 months of billsElectricity bills for the previous year.
DOC 04Roof drawingsApproved architectural roof drawings.
DOC 05Single Line DiagramThe approved electrical SLD.
DOC 06Roof photosRecent photographs of the roof.
Requirements depend on the project and can be discussed during the visit.
Stage 03 · Design & engineering

Your system, engineered on paper first

Our engineers turn the site information into a complete system design: how many panels fit, where they go, which inverter and battery suit your load, and how everything connects safely.

  1. 03.1Roof survey and usable area
  2. 03.2Setbacks, access and dimensions
  3. 03.3Panel layout and string design
  4. 03.4Inverter and battery placement
  5. 03.5Single-line diagram and protection
  6. 03.6Design issued for approval
++ ROOF OUTLINE · ILLUSTRATIVE PARAPET TO PARAPET SETBACK PLANT INVERTER BATTERY PV ARRAY DC ISO INVERTER AC PROT GRID · METER
Rooftop PV design
Sheet01 / 06
StageDesign
StatusDraft
Stage 04 · Approvals

Approvals handled for you

Grid-connected systems need utility and authority approval before they can be connected. We prepare and submit the drawings and documents, including DEWA approvals for projects in Dubai, and follow up until the system is cleared to connect.

Every project is different

The approvals and documents required depend on the project: its location, size, system type and the authority involved. We confirm exactly what applies to yours and guide you through it.

Approval journey SLD · LAYOUT · FORMSAUTHORITYSUBMITTEDUNDER REVIEWAPPROVED
Stage 05 · Supply

Equipment from brands we work with directly

We supply the panels, inverters, batteries and cleaning robots specified in the design. You can also work with us for equipment supply only, if you have your own installer or project team.

Explore our products
Two ways to work with us
Route AComplete EPCOne team from the first visit to commissioning and O&M.
  1. Design
  2. Approvals
  3. Supply
  4. Installation
  5. Commissioning
  6. O&M
Route BSupply onlyThe equipment you need, with technical support on selection.
  1. Solar panels
  2. Inverters
  3. Batteries
  4. Cleaning robots
Stage 06 · Installation

Built on site by our own team

Our installation team follows the approved design, with site safety in place from the first day.

  • Mobilisation and site safety
  • Mounting structure
  • Panel installation
  • DC cabling and protection
  • Inverter and battery installation
  • AC connection to the building
Scroll to install
0 / 24 panels
ILLUSTRATIVE · ROOFTOP
Stage 07 · Testing & commissioning

Checked, tested and switched on

Before the system goes live, our engineers inspect and test the installation, set up the equipment and confirm everything works as designed. Then the system is switched on and handed over.

Illustrative only. Every system has its own test plan. Talk to our engineers
From checks to live
01InspectThe installation, checked against the design.
02TestSafety and electrical tests before switch-on.
03Set upInverter, battery and monitoring configured.
04Go liveSwitched on and performing as designed.
System live
Stage 08 · Handover & O&M

Handed over, and looked after

At handover you receive the documents for your system and a walkthrough of how it works. After that, our operation and maintenance service keeps it performing.

Ask about O&M
After switch-on
HandoverYour system pack
  • As-built drawings
  • Test and commissioning reports
  • Equipment warranties
  • Monitoring access
  • Operation walkthrough
O&MOngoing care
  • Periodic inspections
  • Monitoring and performance review
  • Corrective maintenance
Where we work

From Dubai to wherever your project is

We deliver projects across the UAE, the wider Middle East and Africa. Meet us online, face to face, or on site. Distance doesn’t change the process.

Coverage
BaseUAEDubai office and projects across the Emirates.
RegionMiddle EastProject discussions and delivery across the region.
RegionAfricaSupply and project delivery across the continent.
Online meetings · face-to-face meetings · project consultations
Start your project

Tell us about your site. We’ll take it from there.

A short conversation is all it takes to begin.