Public & infrastructure

Solar for stations, streets and public sites.

We design, supply, install, test and commission solar and battery systems for transport stations, public buildings, roads and remote sites across the UAE, the Middle East and Africa.

How it works

See how a station runs on solar.

Illustration of a train station with solar panels on the station roof and platform canopy, inverters, battery storage, off-grid solar street lights and a grid connectionUtility grid
Roof solar
Canopy
Inverters
Battery
Street lights
Grid
Station viewDaylight

Illustration only. Every site is designed for its own needs. Tip: click any part of the station.

Rooftop solarPart 01 / 06

Station roof solar

Panels on the station roof produce power for the lighting, cooling and systems inside. We lay them out around the roof structure, access routes and the owner's standards.

Daylight: Producing power from the sunEvening: Resting until sunrise
  • MountingRoof structures
  • PanelsOSDA or Astronergy N-type
  • DesignTo the owner's standards
Solar canopyPart 02 / 06

Platform canopy

A solar canopy shades the platform and produces power at the same time. The structure is engineered for the site, and installation is planned around the station's operations.

Daylight: Shading the platform and producing powerEvening: Resting until sunrise
  • Does two jobsShade and power
  • StructureEngineered for the site
  • InstallationPlanned around operations
Power conversionPart 03 / 06

Inverters

Inverters turn the panels' DC power into AC for the station and manage the flow between solar, battery and grid. Output can be monitored remotely.

Daylight: Converting solar power for the stationEvening: Running the station from the battery
  • BrandKSTAR, or to the specification
  • LocationInverter room
  • MonitoringRemote, per project
StoragePart 04 / 06

Battery storage

Batteries store solar power during the day for use in the evening, and can keep chosen loads running in a power cut.

Daylight: Charging from solarEvening: Supplying the station
  • TypeKSTAR storage
  • BackupChosen loads in a power cut
  • SizingMatched to the site's loads
Off-grid lightingPart 05 / 06

Off-grid street lights

Each light carries its own panel and battery, so it needs no cable to the grid. It charges during the day and switches on at dusk, which suits remote roads and sites far from the network.

Daylight: Charging its own batteryEvening: Lights on, running on battery
  • Grid connectionNot needed
  • PowerOwn panel and battery
  • Our projectNorthern Emirates, completed
Grid connectionPart 06 / 06

Meter and grid connection

The station stays connected to the grid. The meter records what the site imports and, where the local scheme allows, what it exports. We coordinate the approvals with the local authority.

Daylight: Surplus solar to the grid, where allowedEvening: Topping up when the battery runs low
  • ApprovalsDEWA, Etihad WE or TAQA
  • MeteringImport and export
  • CoordinationWith the authority and owner
What we handle

One team, from site survey to handover.

  1. 01

    Site survey and load study

    We visit the site, review the roofs, canopies and electrical rooms, and study how much power the site uses and when.

  2. 02

    Design to owner and authority standards

    Structural, electrical and safety design prepared to the asset owner's specifications and the local authority's requirements.

  3. 03

    Approvals and NOCs

    We prepare the submissions and coordinate the approvals and NOCs with the authority and the asset owner.

  4. 04

    Equipment supply

    Astronergy and OSDA panels and KSTAR inverters and storage, supplied by AST as their distributor, or to the project's specification.

  5. 05

    Installation on live sites

    Work is planned around the site's operations, with method statements and safety controls agreed with the owner before we start.

  6. 06

    Testing, commissioning and O&M

    Every system is tested and commissioned before handover, with documents for the owner and operation and maintenance after.

Scope and approvals vary by project. We agree them with you, your consultant and the authority at the start.

Our public projects

Stations, roads and public sites.

Etihad Rail passenger train at a station platform
Etihad Rail passenger stationsDubai, Abu Dhabi, Sharjah and Fujairah
Transport

Etihad Rail passenger stations

Grid-connected solar for four Etihad Rail passenger stations in Dubai, Abu Dhabi, Sharjah and Fujairah. AST delivered full EPC and provides operation and maintenance.

  • 4Passenger stations
  • EPC + O&MOur scope
  • CompletedStatus
  • UAEFour emirates
See all our projects
Off-grid solar lighting installed by AST in the Northern Emirates, UAE
Off-grid

Northern Emirates lighting

Off-grid solar lighting at four sites: engineering, procurement, installation and commissioning by AST. No grid cable needed.

The Solar Innovation Center tower in Dubai
Solar project support

Solar Innovation Center, Dubai

Solar project support for the Solar Innovation Center in Dubai. Scope of work: contractor services.

Questions

Good to know.

Can’t find your answer? Ask our team

Can you work on a site that stays open to the public?

Yes. We plan the installation around the site's operations, agree method statements and safety controls with the owner, and phase the work where needed. The details depend on the site.

Who handles the approvals?

We prepare the submissions and coordinate with the authority: DEWA in Dubai, Etihad WE in the Northern Emirates and TAQA Distribution in Abu Dhabi. Requirements vary by project and by owner.

Can solar work where there is no grid connection?

Yes. Off-grid systems with their own panels and batteries can power lighting and equipment on remote roads and sites. Our solar lighting project in the Northern Emirates works this way.

Do you work with consultants and main contractors?

Yes. We can work directly for the asset owner or as part of a wider project team, and provide the design, documents and equipment data the consultant needs.

Do you offer maintenance after handover?

Yes. We offer operation and maintenance, including monitoring and preventive maintenance, so the system keeps performing. On the Etihad Rail stations we provide it today.

How do we get started?

Send us the site location, drawings or photos of the roofs and canopies, and the scope you have in mind. Our engineers will review it and suggest the next step. We can meet online or face to face.

Planning a public project?

Send us the site and the scope. Our engineers will come back with the next step.